Compact Substation Flood Level and Plinth Interfaces for an RFQ
A compact substation RFQ for a flood-exposed site should include the civil engineer's design water level, proposed equipment elevation, cable-opening arrangement, drainage concept and access requirements. Ask the package supplier to identify the corresponding equipment interfaces and limitations. A raised plinth or enclosure IP code alone does not establish a flood-resilient installation. The civil, electrical...
Read guide




